Home > Project Execution Planning

Check List for Carpets and Vinyl Flooring

Er. Parbhakar Dwivedi
0
 

       

Check List for Carpets and Vinyl Flooring Doc Ref No. 1.19
Contractor: Client
Project: Location:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check points Ok Not Ok NA Remarks
BEFORE START OF WORK
Is the sub-base prepared and leveled uniformly adequately to take the carpet/vinyl floor?
Are all welding works completed before carpeting/vinyl flooring?
Is the floor thoroughly cleaned before laying the carpet/vinyl floor?
Is the area where carpet or vinyl floor is to be laid barricaded to restrict movement?
Is the grade of materials and adhesives used as per specifications?
Is the floor free from any dampness?
Are all the works which produce dust completed before carpeting/vinyl flooring starts?
Are all synthetic spray paint works complete before carpeting/vinyl flooring starts?
DURING EXECUTION
Is it ensured that no welding works are happening in the vicinity?
POST COMPLETION
Is the carpet or vinyl floor covered with a protective layer?
In the areas carpeted or where vinyl floor is laid, is there restricted usage of scaffolding materials?
Has it been ensured that in these areas there is restricted storage of high load materials?
After laying, were the levels cross checked?
Are all loose threads and edges trimmed off after laying?
Are transition and interface trims fixed to avoid damages?
Is the protective layer cleaned regularly?
Are all activities that cause damage to flooring avoided in these areas?
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close