Check List for Circuit Breakers

Er. Parbhakar Dwivedi
0
 

       

Check List for Circuit Breakers Document Ref. No. 2.12
Contractor: Client:
Project: Location:
Supplier/Vendor:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check Points Observations
Contactor/ Vendor Client
Preliminary Check
Check name plate details according to Specification.
Check for physical damage.
Check tightness of all bolts, clamps and Connecting terminals.
Check oil level, air pressure and leakage (Wherever applicable).
Check earth connections.
Check cleanliness of insulators and Bushings.
Check all moving parts are properly Lubricated.
Check heaters provided.
Commissioning Checks
Check alignment of breaker trucks for free movement, check correct operation of shutters.
Slow-closing / opening operation
Check control wiring for correctness of connections, continuity and IR values
Manual operation of breakers (only after Filling oil in the tank). Power closing / opening operation manually and electrically
Breaker closing and tripping time
Breaker closing and tripping time
IR values, resistances and minimum pick up voltage of coils
Contact resistance
Simultaneous closing of all three phases
Pole discrepancy tests
Single and three phase auto-reclose operation
Check electrical & mechanical interlocks provided
Checks of spring charging motor: correct operation of limit switches and time of charging
Checks on C.Ts
All functional checks
Oil pressure in case of minimum oil circuit breakers of E.H.V circuits
Additional checks for Air Blast Circuit breakers
Calibration of pressure gauges and pressure switches
Air leakage tests
Adequacy of air receivers, for the designed set for operation
Operation of breaker (by pneumatic and electric impulses) at the pressures specified
Time of blowing-out of air during closing and opening operation
Checks on ‘drying air device’
Blocking of opening at low pressure
Pneumatic pole discrepancy protection
Safety valve settings
Check the compressed air supply system and pressure switch settings
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close