Check List for Conduiting & Wiring

Er. Parbhakar Dwivedi
0
 

       

Check List for Conduiting & Wiring Document Ref. No. 2.10
Contractor: Client:
Project: Location:
Supplier/Vendor:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check Points Observations
Contactor/ Vendor Client
Check the wiring diagram in conjunction with conduit layout
Check that Size of conduit is right for number of wires to be drawn through
Check that the material & insulation class of wires is as per specification
Ensure no two phases run through same conduit
Ensure right colour of wires used for right phase (R- Red, Y- Yellow, B- Blue, Black – Neutral, Green – Earth)
Ensure conductor will have no joints in conduits & junction boxes (i.e. Conductor will run continuous from outlet)
Ensure correct phase load balancing
Check the coordinated routing of conduits in relation to other services
Ensure conduits run in true horizontal / vertical runs and do not criss cross
Ensure spacing between conduit to conduit are evenly distributed and would accommodate enough space for junction boxes
Check if conduits are clamped at 1.5mtr for vertical run and 600mm for horizontal run
Ensure last stretch of conduit (from hard structure to false ceiling) is flexible conduit
Ensure wire through flexible conduit gets terminated at a connector. Ensure that connector could be lowered down through false ceiling cut-out along with Light fitting for maintenance
Ensure the Electrical & Mechanical Continuity in case of MS Conduits.
AVOID plain slip or pin-grip sockets. In case of screwed conduit, lock nuts must be used.
Ensure back boxes are fixed as per co-ordinates given by interior designer
Ensure boxes would be flush to finished surface
Check boxes location for any fire hazard finishes / material
Check size of boxes in relation to receptacles to be mounted
Ensure switches, sockets, flush plates, lighting fixtures are as per interior design details and in conjunction with electrical engineering safety, user and maintenance friendly
Check if wires are terminated properly
Check whether wires are clamped / bunched inside panels and numbered in DB’s
Megger test the wire and ferrule
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close