Check List for Cooling Tower | Document Ref. No. 3.4 | |||
Contractor: | Client: | |||
Project: | Location: | |||
Supplier/Vendor: | ||||
Reference Drawing no: | ||||
Check List (Please tick mark in appropriate column) | ||||
Check Points | Observations | |||
Contactor/ Vendor | Client | |||
A) SUPPLY | ||||
1) Shape ( Any Damage during Transit ) | ||||
2) C.T Brand | ||||
3) Type | ||||
4) Discharge Capacity (US GPM) | ||||
5) Motor HP and Brand | ||||
6) Fins are properly aligned | ||||
7) Motor Insulation Class | ||||
B) INSTALLATION | ||||
1) Ensure that the Cooling Towers are placed on properly leveled surface with Mountings/V I Pads | ||||
2) C.Ts Valves and Piping Connection as per design Drawing | ||||
3) Cooling water Pumps installation should be Proper | ||||
4) Installation of Expansion bellows as per design Drawing. | ||||
5 ) Installation of Pot Strainers as per design Drawing | ||||
6) Electrical cables installation as per design Specification. | ||||
7) Soft water makeup and quick fill connection | ||||
8) Drain Connection | ||||
8) Equalization Line installation | ||||
General remarks, if any
|
||||
Checked by:____________________________ (Site Engineer) Signature: Date : |
||||
Review and approval by: CM/ PM
|
Sponsored
PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"
QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy
Comment:
Name:
Email:
Civil N Construction Blog
Relevant Topics
Check List For Toitet Fixtures
Check List For Structural Steel Work
Check list for aluminium and glazing work
Check list for carpets and vinyl flooring
Check list for flush door shutter
Check list for framework for gypsum ceiling
Check list for framework for partition
Check list for laminating and veneering
Check list for metal door frames
Check list for skinning-for-partition
Check list for timber-door-window-ventilator
Check list for woodwn-door-window-ventilator-frames
Check list for work-station-and-loose-furniture
Check list for cement concrete flooring IPS
Check list for ACC block masonry
Check list for kota stone flooring
Check list for polythene membrane under floor
Check list for terrazzo flooring
Check list for wall cladding and flooring
Check list for aluminium formwork
Check list for shuttering and propping
Method statement for brick work
Method statement for concrete work
Method statement for installation of wooden door frame work
Method statement for plaster-work
Method statement for reinforcement work
Method statement for stone-work (wall- cladding)
Method statement for stone work(marble - granite)
Method statement for tile work
Method statement for backfilling & compaction
Method statement for mass excavation
P & M Deployment Release Schedule
Planning Controlling Purpose Advantage Planning Helps To Avoid
Planning Personnel Responsibilities
Check List For Main Distribution Board
Check List For Pipework & Sprinklers
Check List For Condenser Water Pump
Check List For Battery & Battery Charger
Check List For High Voltage Switchgear Lt Panel
Check List For Fan Coil Unit (fcu)
Check List For Circuit Breakers
Check List For Conduiting & Wiring
Check List For Current Transformer
Check List For High Voltage Switchgear HT Panel
Check List For Secondary Chilled Water Pump
Check List For Primary Chilled Water Pump
Sponsored
PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"
QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy