Check List for HVAC Piping Works

Er. Parbhakar Dwivedi
0
 

       

Check List for HVAC Piping Works Document Ref. No. 3.3
Contractor: Client:
Project: Location:
Supplier/Vendor:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check Points Observations
Contactor/ Vendor Client
A. PRE-INSTALLATION
1) Material specification as per tender
2) Pipe &fittings are free from damage
3) Random checks on weld/screw joints for prefabricated pipe
4) Testing if any specified in tender
B. INSTALLATION
1) One coat of Red Oxide Primer before installation.
2) Properly Shoe joint should be made before welding of pipes
3) Pipe routing
4) Weld on all the joints in the pipes
5) Supports for piping
6) All the line equipment including valves etc.
7) All vents, drains are fitted where required.
8) Terminal connection are done as per requirement
9) All bolts and nuts are tightened correctly
10) Flanges/Gasket are put correctly
11) Hydro testing is done for piping network
12) Painting as per color code/ Spec
C. INSULATION
1) Material specification as per tender
2) Thickness
3) Bonding to pipe
4) Valves remains free to access/ operation
5) Insulation includes the valves also except the Handle.
D. CHECK EXPANSION TANK
1)size
2) Location/tap off point
3) Thickness
4)Pipe connection
5)Pressure gauge
6) Insulation of expansion tank
7.) Expansion tank is as per drawing
E. TESTING
1) All open ends are properly capped off
2.) Check all valves are in open position
3) Tool pieces are in temporary position of valve
4) non return valve in correct position
5) Put water in pipe
6)Pressurize the system gradually
7) Check test pressure
F. POST TESTING/PRE COMMISSIONING
1) All inline Equipment’s are properly fitted
2) Any damaged insulation on pipe
3) Damage insulation on valves etc.
4) Regulating/isolating valve orientation
5) Position of gauges etc.
6) Painting damage at any location
7) Correct damage painting
8)System has been pressure tested
9) Valves are operable
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close