Check List for Main Distribution Board

Er. Parbhakar Dwivedi
0
 

       

Check List for Main Distribution Board Document Ref. No. 2.5
Contractor: Client:
Project: Location:
Supplier/Vendor:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check Points Observations
Contactor/ Vendor Client
Check for transit damage.
Check Earth bar provided in the cubicle.
Check Earth bar connected to earth station.
Check all non-carrying parts of electrical equipment are connected to the earth bus.
Check all cable glands are earthed
Check / measure earth resistance-preferably less than 1 ohm & not more than 3 ohms.
Check earthing conductors are connected / terminated properly with lugs / nut & bolts.
Check all cables / wires are terminated with ferrules & lugs of correct size
Check all bus bars / bus bar interconnections are rigidly connected through bolts.
Check that the Bus-bar & Bus chambers are as per approved drawings
Check Bus bar support, attachment, spacing & marking (colour code)
Check the Arrangement of bus bar & main connections
Check Phase sequence & polarity
Check insulation resistance - should be measured – should be about 5 mega ohms.
Check for surface treatment defects.
Check switch board / panel is erected plumb, with clearances as per statutory requirements.
Check whether it anchored to the floor / supporting members.
Check out going feeder portion.
Check the Naming / numbering of all outgoing MCCBs
Check that all terminations are tight & secured in place
Check that proper colour coding has been followed
Check that proper lugs for cables, wires have been used
Check that proper glands, shrouds used
Check that adequate loop is provided
Check that Accessories viz. Ammeters, voltmeters, indicating lamps etc.
are working
Check that all gaskets are intact
Easy access for maintenance
Check that Rubber mats are provided on all four sides
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close