Check List for Pumps

Er. Parbhakar Dwivedi
0
 

       

Check List for Pumps Document Ref. No. 4.3
Contractor: Client:
Project: Location:
Supplier/Vendor:
Reference Drawing no:
Check List (Please tick mark in appropriate column)
Check Points Observations
Contactor/ Vendor Client
Pump Type & No’s
Pump Location
Pump is inspected for any damage when delivered to site and that any such damage observed, to be dealt with in writing and action taken accordingly.
Pump name plate details comply with specifications
Manufacturer's operating and maintenance instructions are supplied along with recommended spare parts lists, at time of delivery
All bearings / housings / flanges and similar ports are protected at all times from ingress of foreign matter or damage
Pump is installed in accordance with the manufacturer’s instructions. Ensure that pump is prepared accordingly for alignment. Carry out initial alignment check prior to hook up with motor.
Correct type / material / size / anchor bolts / nuts / washers are fitted to pump base
Pump is free from all stresses and shaft rotates freely
Where anti vibration mats are specified, ensure that these are installed to vendor's specification and that all coil springs are set to correct static deflection
Bearings and housings are fully lubricated to manufacturer’s instructions
Strainers and non-return valves are installed in correct location and orientation
Coupling guard is in place and firmly fixed.
Vee belts and pullies apply, ensure that:
a. Pullies are firmly and correctly fixed
b. That pullies are checked for correct alignment
c. That correct sized / matched vee belts are fitted
Pump spindle is free to turn and pump rotation is Correct
Pressure gauges / cocks are fitted as per specification
There are no oil / grease / water leaks
Electrical checks:
a. Phase connection correct
b. Voltage and frequency correct
c. Correct Starter is used with all required protective devices calibrated at correct settings
d. Correct type and rating of fuses used
e. Inter-cabling is correct
f. Earthing checks correct
g. Check for adequate isolation to comply with safety regulations
Control system to be checked as per specification
Instrumentation and calibration checks complete
Running noise level is acceptable as per specifications
Vibration level is acceptable as per specifications
Immediately at start up, after one hour's continuous running, log the following:-
a. Motor speed
b. Pump speed
c. Starting current
d. Running current
e. Suction pressure
f. Discharge pressure
Pump set is closed down and left in safe condition after checks and tests are completed
All test certificates completed by manufacturer during production of pump are available for records etc.
All Project Manager's inspection / checks are carried out and checklists / certificates available for issue to client
General remarks, if any

 

 

 

Checked by:____________________________ (Site Engineer) Signature:

Date :

Review and approval by: CM/ PM

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close