METHOD STATEMENT FOR BACKFILLING AND COMPACTION

Er. Parbhakar Dwivedi
0
 

       

Reference

The following reference shall be used in conjunction with this procedure.

  • Technical Specifications
  • IS Codes-IS 2720
  • Drawings
  • BOQ

Resources Used

A. Manpower

  • Skilled Labour
  • Unskilled Labour

B. Machineryr

  • Excavator
  • Loader
  • Dumper
  • Water Tank
  • 8-10T Roller
  • Plate Compactor

Safety Points

  • All Excavated area of 1.2m or more deep shall be provided with one ladder till the completion of the task.
  • All vehicles shall be provided with reverse alarm and all persons working in that area shall be briefed about the hazards.
  • Proper Inspection to be carried out by Operators before using any equipment. Only experienced operator shall operate the equipment.

Work Procedures

  • All the spaces around the foundation structures in pits/trenches/etc. shall be cleared of all debris, brick bats, mortar droppings etc.
  • The debris so collected (as above) shall be disposed off as specified separately under method statement for disposal of surplus materials.
  • The earth used for filling shall be free from all roots, grass, shrubs, rank vegetation, brushwood, tress, sapling, contaminated soil and rubbish.
  • Suitably of earth for fill and its OMC, MDD shall be checked prior to use.
  • Earth shall be filled in the pits & trenches in regular horizontal layers not exceeding 200mm in thickness.
  • Filling can be done manually with spades & Pans or mechanically but ensuring layer wise filling.
  • Each layer shall be watered till it moisture is equal to OMC.
  • Level the top and compact with plate compactor, Roller, etc. to give sufficient compaction of MDD.
  • Take field compaction test the degree of compaction is achieved 95% of MDD or as specified.
  • The top of filling shall be neatly dressed and leveled to required elevation. Special care will be taken not to damage adjoining structures and services during filling and compaction.

Precautions

  • Thickness of layers & test results
  • Ground level satisfactory.
  • Base is clean and free unsuitable materials

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close