METHOD STATEMENT FOR SHORING

Er. Parbhakar Dwivedi
0
 

       

Reference:

The following reference shall be used in conjunction with this procedure

  • Technical Specifications
  • IS Codes
  • Drawings
  • BOQ
  • Soil Investigation Report

Resources used

A. Manpower

  • Skilled Labours
  • Unskilled Labours

B. Machinery

  • Backhoe (JCB)

Safety Points

  • Safe slopes in excavations
  • Fencing of excavation area
  • Notices and warning signs
  • Protection from falling objects into Pit
  • Excavations adjacent to buildings or structures

Work Procedures

  • Removing of loose earth by mechanical means and manual as necessary
  • Inspection for any loose part that is bound to collapse is also removed by mechanical means.
  • Base of around 2.5 to 3 m wide is provided beyond the retaining wall out line. (This base is case specific, depends upon the height of excavation)
  • Width of the shoring should expand beyond the collapsed part at least 5m beyond the edge of collapse.
  • Now placing of bags filled with soil should start.
  • It is done in progressive manner with utmost care so that it remains steadfast
  • A step of 500mm is provided on every 2m height to get the desired stability. (It is case specific, depends upon the height of excavation).
  • Steps are provided for ease of access and stability.
  • At the final stage top base should be only as wide as necessary to decrease the risk of collapsing.
  • Protection of bags is provided by covering them with loose soil.

Precautions

  • Shoring to be done for excavation in soft, loose or slushy Soils.

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close