P & M Deployment / Release Schedule

Er. Parbhakar Dwivedi
0
 

       

SL. NO EQUIPMENT UNIT QUANTITY REQUIRED MOBILIZATION DATE DE-MOBILIZATION DATE DURATION (MONTHS)
EARTHWORK EQUIPMENT
1 JCB Nos.
2 Dumper Nos.
3 Tractor with Hydraulic Trolley Nos.
LIFTING EQUIPMENT
1 Tower Crane 65 mtr. Boom Nos.
2 Wheel Mounted Mobile Crane Nos.
3 Hydra Nos.
4 Monkey Hoist Nos.
5 Material Hoist Nos.
6 Passenger Hoist Nos.
CONCRETING EQUIPMENT
1 Automatic Batching Plant (30 cum/hr) Nos.
2 Concrete Pump - 30 (cum/hr) Nos.
3 Concrete Pipe Line RMT.
4 Concrete Pipe Bend 60 degree Nos.
5 Concrete Pipe Bend 45 degree Nos.
6 Concrete Pipe Hose 3 mtr. Nos.
7 Transit Mixer Nos.
8 Boom Placer Nos.
9 Double Bag mixer Nos.
10 Single Bag mixer Nos.
11 Ordinary Vibrators - Electrical Nos.
12 Ordinary Vibrators - Diesel Nos.
13 60mm Needles for above vibrator Nos.
14 50mm Needles for above vibrator Nos.
15 40mm Needles for above vibrator Nos.
16 25mm Needles for above vibrator Nos.
17 Wheel Barrow Nos.
18 Blower Machine - hand held Nos.
.
CARPENTERY EQUIPMENT
1 Wood Cutting machine Nos.
2 Circular saw - hand held Nos.
.
REINFORCEMENT EQUIPMENT
1 Bar Bending Machine Nos.
2 Bar Cutting Machine Nos.
3 Hammer (10 Kg) Nos.
FABRICATION EQUIPMENT
1 Welding Machine - 3 Phase Nos.
2 Welding Machine - 1 Phase Nos.
3 Gas Cutting Set Nos.
4 Grinding Machine - hand held Nos.
5 Electric Drill Machine Nos.
6 Buffing Machine Nos.
7 Hilti Breaker Nos.
8 Spray Painting Compressor Nos.
9 Painting Torch Nos.
.
LABOROTARY EQUIPMENT
1 Cube testing Machine Nos.
2 Oven Nos.
3 I.S. Sieves set for Aggregate Nos.
4 I.S. Sieves set for Sand Nos.
5 Sieve Shaker Nos.
6 Electronic Weigh Balance - 15 Kgs Nos.
7 Table Weigh Balance Nos.
8 Set of Jars/Beakers/Trays Nos.
9 I.S.I Cube Moulds Nos.
10 Slump cone with tamping rod Nos.
11 Rapid Moisture meter Nos.
12 Core Cutter for Soil Nos.
13 Rebound Hammer Nos.
.
SURVEYING EQUIPMENT
1 Auto Level Nos.
2 5mm Leveling Staff - 5 Metres Nos.
3 Digital Theodolite Nos.
4 Total Station Nos.
.
CURING & DE-WATERING EQUIPMENT
1 Dewatering pump - 10 HP Nos.
2 Dewatering pump - 5 HP Nos.
3 Dewatering pump - 3 HP Nos.
4 Curing Pump - Multistage Booster Pump - 5 HP Nos.
5 Curing Pump - 3 HP Nos.
6 Curing Pump - Tullu - 1 HP Nos.
POWER EQUIPMENT
1 DG Set - 250KVA Nos.
2 DG Set - 125KVA Nos.
3 DG Set - 62.5KVA Nos.
4 DG Set - 30 KVA Nos.
.
TRANSPORTATION MACHINERY
1 Tractor with Trolley Nos.
2 Site Utility Vehicle Nos.
3 Water Tanker Nos.
.
OFFICE EQUIPMENT
1 Computers Nos.
2 Printer - Laser Jet Nos.
3 R.O. system Nos.
4 Water Cooler Nos.
GENERAL EQUIPMENT
1 Earth Compactor Nos.
2 Hilti Breaker Nos.
.
STORE'S EQUIPMENT
1 Weigh Balance - 100 Kgs Nos.
.
.
.

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close