Planning & Controlling, Purpose, Advantage, Planning helps to avoid

Er. Parbhakar Dwivedi
0
 

       

Introduction:

Planning is the process of devising of a workable scheme of operations that, when put into action, will accomplish an established objective. The most time consuming and difficult aspect of the job management system planning is also the most important. It requires an intimate knowledge of construction methods combined with the ability to visualize discrete work elements and to establish their mutual interdependencies. If planning were to be the only job analysis made, the time would be well spent. To prepare the Construction planning, scheduling and networking, information must be sought from many sources. Guidance from key personnel involved with the project, such as estimators, the project manager, the site In-charge, and the site engineer, can be obtained from a planning meeting or perhaps a series of meetings. The network serves as a medium whereby the job plan can be reviewed, criticized, modified, and improved. As problems arise, consultations with individuals can clear up specific questions.

The important point here is the need for full group participation in the development of the network and collective views must be solicited. Participation by key subcontractors and suppliers is also vital to the development of a workable plan.

It must be recognized that the project plan represents the best thinking available at the time it is conceived and implemented. However, no such scheme is ever perfect and the need for change is inevitable as the work progresses. Insight and greater job knowledge are acquired as the project evolves. This increased cognizance necessarily results in corrections, refinements, and improvements to the operational plan. The project program must be viewed as a dynamic device that is continuously modified to reflect the progressively more precise thinking of the field management team.

While in project controlling/monitoring phase planning engineer has to measure the performance and inform the team about the progress and suggest to them, where performance needs improvement. Monitoring implies communicating effectively with the project management team, the client and own management, about what is happening at the project and future course of action to be taken to expedite progress of work or to avoid a potential unwanted situation.

Purpose of Planning

The ultimate purpose of planning is to build a model, that allows you to predict the activities and resources that are critical for the timely completion of the project. Planning allows the strategies to be implemented to ensure that these activities and resources are managed and the project delivered both “on time” and “within budget”.

Advantage of Planning

Optimized Time

Eliminate or reduced uncertainty

Improve efficiency of the operation

Obtain a better understanding of the objectives

Optimized resource

Provide a basis for Monitoring and controlling work

Provide early warnings of potential problems

Take PROACTIVE not reactive actions

Planning & monitoring helps to avoid

Delays in Project work

Loss of Revenue

Loss of facilities

Additional changeover cost

Inconvenience cost

Contractual Disputes

Extension of time claim by contractors

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close