Planning Personnel Responsibilities

Er. Parbhakar Dwivedi
0
 

       

1. Planning Data Collection

a. Studying relevant document

b. Collecting all types of required data

2. Planning Time

a. Breaking down project work in to activities

b. Developing network plan

c. Scheduling work

i. Preparation of project summary schedule

ii. Preparation of project master schedule

iii. Preparation of unit wise detailed construction

3. Planning Resources

a. Forecasting Major Construction Material Requirement

b. Planning Construction Material Procurement Schedule

c. Forecasting Manpower Requirement

d. Planning Man Power Procurement Schedule

e. Forecasting Equipment requirement

f. Planning Equipment Procurement Schedule

g. Budget Planning

h. Planning Cash in-flow & out flow

i. Establishing responsibility center

j. Scheduling date wise, category wise Project Direct Labor

4. Planning Implementation, Monitoring & Controlling

a. Resource Productivity Control

i. Labor Productivity

ii. Equipment Productivity

iii. Material Productivity

b. Time Progress Control

i. Measuring the project Time Progress

ii. Analyzing the implication of deviation from project Time schedule

iii. Formulating remedial including Time Crashing to achieve the project Time objective

c. Resource Mobilization Control

i. Updating the resource status & forecasting the resource requirement

ii. Analyzing the implication of variations from the original mobilization plan

iii. Directing resource mobilization for timely completion

d. Direct Cost Control

i. Analyzing causes for variances

ii. Directing Cost economizing measures

iii. Developing unit rates of items of work future tendering

iv. Updating project Cost status

e. Budget Cost Control

i. Evaluating project Cost status and its variations from budget

ii. Analyzing causes for variations

iii. forecasting Production Cost behavior

iv. Initiating Cost reduction measures

f. Work done / Earned value control

i. Evaluating the Monthly Billing status of the project

ii. forecasting cash-in flow

5. Project Management Information System

6. Misc. Responsibility

a. Co-ordination Planning Meeting

b. Co-ordination all technical activities

c. Managing the project information system including submission of reports at predetermined frequency to all concern

d. Setting up a project control room displaying vital up-to-date information like progress of work, resources availability, cost status & anticipated trend

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close


Comment:

Name:

Email:

Civil N Construction Blog



Relevant Topics

Check list for painting

Check List For Toitet Fixtures

Check List For Structural Steel Work

Check list for aluminium and glazing work

Check list for carpets and vinyl flooring

Check list for flush door shutter

Check list for framework for gypsum ceiling

Check list for framework for partition

Check list for grid ceiling

Check list for gypsum ceiling

Check list for laminating and veneering

Check list for metal door frames

Check list for skinning-for-partition

Check list for timber-door-window-ventilator

Check list for waterproofing

Check list for woodwn-door-window-ventilator-frames

Check list for work-station-and-loose-furniture

Check list for cement concrete flooring IPS

Check list for ACC block masonry

Check list for brick-masonry

Check list for concreting

Check list for kota stone flooring

Check list for plastering

Check list for polythene membrane under floor

Check list for pre concreting

Check list for terrazzo flooring

Check list for wall cladding and flooring

Check list for aluminium formwork

Check list for earth filling

Check list for excavation

Check list for PCC

Check list for piling-work

Check list for reinforcement

Check list for shuttering and propping

Checklist for site survey

Method statement for brick work

Method statement for concrete work

Method statement for installation of wooden door frame work

Method statement for plaster-work

Method statement for reinforcement work

Method statement for stone-work (wall- cladding)

Method statement for stone work(marble - granite)

Method statement for tile work

Method statement for backfilling & compaction

Method statement for formwork

Method statement for mass excavation

Method statement for shoring

P & M Deployment Release Schedule

Planning Controlling Purpose Advantage Planning Helps To Avoid

Planning Personnel Responsibilities

Check List For Main Distribution Board

Check List For Cooling Tower

Check List For Pipework & Sprinklers

Check List For Expansion Tank

Check List For Ducting Work

Check List For Condenser Water Pump

Check List For Transformer

Check List For Battery & Battery Charger

Check List For High Voltage Switchgear Lt Panel

Check List For Fan Coil Unit (fcu)

Check List For Cable

Check List For Motor

Check List For Chiller

Check List For Earthing

Check List For Circuit Breakers

Check List For Conduiting & Wiring

Check List For Current Transformer

Check List For Pumps

Check List For High Voltage Switchgear HT Panel

Check List For Control Panel

Check List For HVAC Fans

Check List For Secondary Chilled Water Pump

Check List For Primary Chilled Water Pump

Check List For Busduct

Check List For Hvac Piping Works

Check List For Distribution Board

Sponsored

PD Consulting Engineers Pvt. Ltd. Transforming construction for a new generation "Cost, Quality & Project management"

QS & Cost management, Bill Checking / Audit, Technical Auditors, Valuation, Contract and Tendering, Project Management, Project Planning, Quality Control, Consulting Engineers, Structural Consultancy

Close